Kind of rolled the engine out of the subframe in a very unorthadox manner – unsafe to both me and the engine.
Removed brakes and hubs from one side of the rear subframe.
Cleaned a lot of the crap off the subframe, still needs a more thorough clean and possibly paint. Also started to clean up clutch master cylinder.
Time spent – 3 hours
Money spent – Nothing
Related posts:
- The Chassis arrives! Keith (the previous owner) turned up with the chassis today....
- Stripdown continues Spent a while in the garage this afternoon but didn’t...
- Before the chassis arrives Had conformation that the chassis will be arriving on Monday...
- To the tip Took all the scrap to the tip this morning in...
- Stripdown continues Cleared up the spare parts from yesterday and stashed them...