Pedal Box
Friday, August 6th, 2004The modified steering column and various brackets, bolts and bushes arrived today from Dave Smart (the guy who makes the Freestyle). In the package he included an upto date build manual and a CD with some video footage of Freestyles bouncing and sliding around and going through big puddles and stuff. Claire, my extremely patient and unerstanding girlfriend, will tell you that I couldn’t be any more enthusiastic about my buggy but if I could, I would be more enthusiastic today after seeing those video clips.
Anyway…. more painting and cleaning. Painted the timing cover in silver Hammerite and it looks shite. Reassembled pedal box after reading the proper instructions, this involved drilling various holes in the steel rod that connects the pedal to the plunger in the pedal box. I’m glad of my bench drill fo that, a hand drill would have been hit and miss I reckon. When correctly reassembled I bolted it down after spending some time lining it up with the accelerator pedal, steering column and rack loosely in place.
Pictures show the assembled pedal box. These pictures were mainly took to show the SVA inspector to save me taking the box apart if he needs to see inside.
Time spent - 4 hours
Money spent - £85 on steering column, brackets, nuts, bolts bushes etc
- £6 on Silver Hammerite.